info@koscointeriors.co.uk      01925 633200

  • Merry Christmas and a Happy New Year From all at Kosco
  • Our Christmas shutdown period will be from Wednesday 21st December returning Tuesday 3rd January 2023.
  • We look forward to working with you all again in 2023.

Our industrious start to summer has rolled into autumn!!

  • Health Sector - We have just started phase two of a Physio Suite extension. Works consist of Strip Out, New Stud Walls and Ceilings, Bespoke Joinery, Flooring, Decoration Works along with Mechanical and Electrical Installations. Case Study to follow…
  • Chemical Factory – We are currently carrying out an Office Refurbishment. Works involve Ceiling Installation, Partition Walls and Decoration Works.
  • Birchwood C of E – A full decarbonisation program is currently being undertaken. Works include Insulation above existing ceilings, Existing lighting replaced with Energy Efficient LED Lighting, Single Glazed External Windows replaced with Energy-Efficient UPVC Windows.
  • St Teresa’s, St Helens – Flooring works completed during October half term. A very quick turnaround involved Asbestos removal.
  • LACE, Liverpool – Currently undertaking office alterations to suit the client's requirements.

Summer is finally here and Kosco has had an industrious start!!

  • Atlas Copco - Currently working on an Industrial refurbishment. Works consist of Jumbo Stud Wall installations, Mezzanine floor extension to create a larger office space along with suspended ceilings.
  • Whiston Hospital – Complete ward refurbishment – Works involve the installation of New IPS panels, Vinyl Flooring, Carpet Tiles, Sanitary Wear and plumbing works.
  • Liverpool Hope University – Window Replacements to Green Lane Building.
  • HMS – Liverpool - Works comprising of demolition, suspended ceilings, metal stud partitioning, glazed feature partitioning and door sets.
  • Croda - Leek – Workshop Facility - partition walls, suspended ceilings and joinery works.
  • HMS – Toxteth – Office Refurbishment – metal stud installation, decoration, electrical works and flooring.

We hope your journey out of lockdown is running smoothly as we slowly head back to normality. Stay Safe, Stay Positive, Stay Connected.

  • Clatterbridge Hospital -  Upgrade at a Private Patients Clinic. A full refurbishment of the Reception Area and WC’s.
    Works comprising of feature lighting, decoration, flooring and installation of reception desk.
  • Warrington – Laboratory refurbishment -  metal stud installation, suspended ceilings and decoration.
  • We would like to wish all our clients, suppliers and contractors a Merry Christmas and best wishes for a happy and prosperous new year.

We hope everyone stays safe during the Christmas break and we look forward to working with you again in 2021.

WHAT OUR CUSTOMERS SAY

  • I would like to thank Kosco Interiors for the project you have just completed at our offices. The programme was tight and the fact that you managed to finish ahead of schedule was brilliant news and a credit to all of your workforce.
    Thanks again and I look forward to working with you in the future.

    Kevin Harvey - Archdiocese of Liverpool
  • I would like to extend my thanks to the Kosco team for works recently. Both the site and office teams worked diligently throughout the entire project from inception through design to hand-over ensuring on time and on budget, deliverable at the highest standard of quality.
    Congratulations to all your team members for a truly excellent result which will add significant medical benefit to the local community.

    Mark Vollens - Olympus Medical, University Hospital, Ayr
  • We are over the moon with the recent office alterations undertaken at our premises in Lancaster. A big thanks to all involved.

    Managing Director - Ascentis
  • Thanks for all your dedication and hard work supporting our site team to make this happen. The finished project looks sharp! Please cascade Hollingsworth Ellery’s appreciation to your team. It has been an amazing effort all round.

    Steve Ellery - Hollingsworth Ellery
  • The construction and fit-out work to the Cornerstone Lounge and Retail Unit for Liverpool Hope University, was carried out to a high quality standard and the Kosco staff were always co-operative and helpful.

    B Hodge - BV Architects
  • Kosco Interiors have carried out various projects here at Meadowside Cp and Nursery School. We are extremely happy with their workmanship. Their quotes have always been competitive, staff were friendly and approachable and all work completed to a high standard.

    P Wilkinson - Meadowside Primary School
  • I am particularly pleased at the level of communication with on-site staff and the way Kosco have handled the asbestos removal. Thanks to all your staff.

    M Webb - Liverpool & Sefton Health Partnership
  • The Vice-Chancellor Professor Pillay asked me to pass on his thanks to your guys for building the Gazebo, he said they did a great job on a difficult project.

    David Kerry - Liverpool Hope University
  • The team at Kosco and the contractors they work with provided a first class service, meeting all deadlines and to a high standard. They were extremely flexible with any changes during the project, which has resulted in an amazing new office and fantastic workspace for Tachodisc Distribution.

    June Powell - Freight Transport Association
  • Just a quick note, to thank Kosco for the tremendous effort on the H89 project. Quick, well organised, great standards!

    Airbus Hanger 89
  • Thank you for your efforts in completing the new Customer Suite. Another fantastic performance by you all supporting the early handover of this project and at such a high level of finish. The facility looks superb !

    Anonymous - Large manufacturing plant in Broughton.
  • We have worked with Kosco on a number of occasions over the past 15 years. The work they do is carried out with the utmost care and finishing is always of a high standard. I would not hesitate to recommend Kosco Interiors.

    Distinctive Medical
  • Once again we are delighted with the works done, all on timescale which was a fairly tight Programme to hit. Please pass on my thanks to all involved in the Management, Installation and off Site Support. Excellent team effort. Excellent outcome.

    Hollingsworth Ellery
  • I would like to thank all at Kosco for another 1st class installation here at Urenco. The team worked as per instructions and permits, all work was completed on time which is always appreciated by the client, as the room in question is not always easy to book out for this type of work.

    Steve Keeley - Moorcroft Construction

Kosco Logo S